Sea Works Williamstown
Accelerated started a new project this week with Duratec and the Williamstown Sea works.
Duratec has been engaged by the client to retro fit structural beams and new piles to the underside of a concrete pier as the timber piles are failing.
Accelerated is assisting Duratec with the works by drilling inverted holes in the concrete head stocks under the pier, these are to temporarily support steel beams that will be permanatly fixed inplace once the new piles are driven through them.
We’re also engaged to widen holes in the concrete pier where the new piles will be driven through.
More photos to come.
On of our dd350 drills set up to drill some inverted holes for chemset fixings under the pier
Duratec floating another steel section into place to under the pier, new steel piles laying in the background.
Road saw and drill set up ready to widen penetrations
Penetrations in Pier where piles are to be driven through