Brighton Column Removal
Accelerated was engaged by a local form worker to remove some Sample Columns that had been poured to show the builder and architect the detail that could be achieved.
Unfortunately these had been constructed at the rear of the build with no machine access, so they only option was to wire saw them and remove with the tower crane. Job was finished off with a flush cut that would later be covered with outdoor tiles.
“r” Shaped sample columns being cut into three sections, core holes for lifting points
Hilti Wire saw set to flush cut base of columns
Finished flush cut of column